For thousands of other reports visit RSC's Mineral Intellingence Map

Tungsten Mining NL

opaxe

Summary

Project:

Mt Mulgine

Deposit:Mulgine Hill
Location:Australia
Commodities:Tungsten-Molybdenum
Date:10/30/2018
Report Code:JORC
Report Type:Exploration/Drilling Update
Project Stage:Pursuing Resource Increase/Upgrade
Report details:30-10-2018: Tungsten Mining NL announces an Exploration/Drilling Update report for its Mulgine Hill deposit at the Mt Mulgine project. Drilling results incl. 14.0m @ 3.85% WO3 from 45m. Australian tungsten development company, Tungsten Mining NL (ASX: TGN
Resources:(not mentioned in this report)
CP/QP:[Overall Report]: Peter Bleakley (Independent)
ABSTRACT:Australian tungsten development company, Tungsten Mining NL (ASX: TGN) (“Tungsten Mining” or “the Company”), is pleased to report on results from drilling at the Mt Mulgine Project in the Murchison Region of Western Australia, approximately 350km north northeast of Perth. Between the 27 August and 5 October 2018, the Company drilled 103 reverse circulation (RC) holes and four diamond holes on the Mount Mulgine Project (Figure 1). This report announces results from the first 92 RC holes. Tungsten Mining has 100% of the tungsten and molybdenum rights on a contiguous group of tenements at Mt Mulgine that have been the subject of significant previous exploration for tungsten and molybdenum. Two near surface Mineral Resources have been delineated by previous explorers at the Mulgine Trench and Mulgine Hill deposits. Tungsten Mining is focussed on delivering on its strategic development plan directed at the production of tungsten concentrate from the Mt Mulgine Project. The drilling was part of a larger program of project development at Mt Mulgine, which has included establishing suitable locations for mine site infrastructure, collecting geotechnical data, providing material for metallurgical studies, completing infill drilling across the Mulgine Hill Mineral Resource, and undertaking exploration drilling. Between 27 August and 5 October 2018, Tungsten Mining drilled 91 RC holes for 5,195 metres to complete 20 metre infill sections over pit optimisations at Mulgine Hill. Holes focused on the proposed main pit and two proposed satellite pits (Figure 2). Results are refining the understanding of mineralisation at Mulgine Hill and continue to confirm continuity of mineralisation present (Figure 3). Better intersections include 31 metres at 0.34% WO3 from 17 metres, 14 metres at 3.85% WO3 from 45 metres and 18 metres at 1.61% WO3 from 54 metres.

Full Report

opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.

Full Report