For thousands of other reports visit RSC's Mineral Intellingence Map

Tanzanian Gold Corp.

opaxe

Summary

Project:

Buckreef Mine

Deposit:Buckreef Mine
Location:Tanzania
Commodities:Gold
Date:5/30/2019
Report Code:NI43-101
Report Type:Exploration/Drilling Update
Project Stage:Mine Development
Report details:30-5-2019: Tanzanian Gold Corp. announces an Exploration/Drilling Update report for its Buckreef Mine deposit at the Buckreef Mine project. Drilling results incl. 89.6m @ 1.5g/t Au from 147m. TORONTO, May 30, 2019 (GLOBE NEWSWIRE) -- Tanzanian Gold Corpor
Resources:(not mentioned in this report)
CP/QP:[Overall Report]: Peter Zizhou (Internal)
ABSTRACT:TORONTO, May 30, 2019 (GLOBE NEWSWIRE) -- Tanzanian Gold Corporation (TSX:TNX) (NYSE American:TRX) (the "Company”) is pleased to announce results from three holes that bring to an end Phase I of the in-pit drilling program. On January 10, 2019, the company announced a three Phase drilling program at the Buckreef Gold project. The primary objective of Phase I was to upgrade Inferred Resources within the open pit, as defined in the June 26, 2018 43-101 Pre-Feasibility Study, as well as to add additional ounces to the pit. In total approximately 4,700m where drilled in the Phase I pit infill drilling program. Mr. James Sinclair, Tanzanian Gold Corporation (TRX) Executive Chairman said of the Phase I results, “Our open pit and the substantive mineralized zones we are confirming both in, and below the pit continue to impress. I believe we are seeing our thesis of wider, deeper, richer being confirmed as we progress our drilling program from Phase I into Phase II. Intersecting 89.6 meters or approximately 294 feet of continuous gold mineralization outside and below the pit is spectacular and bodes well for our future”. Hole U22-1 was a diamond drill hole that went through the open pit and continued outside and below the current pit bottom. Both Hole L19-1 and PBR011 were RC holes that were in the open pit. Each of these three holes intersected significant intervals of continuous gold mineralization ranging from 89.6 m to two intersections of about 30m and to three intersections in the range of 17m - 21.0m. Also notable is the fact that many of these intersections were at an average gold grade that is significantly higher than the weighted gold grade of 1.5 g/t for the entire open pit.

Full Report

opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.

Full Report