For thousands of other reports visit RSC's Mineral Intellingence Map

Skeena Resources Ltd.

opaxe

Summary

Project:

Snip

Deposit:Snip
Location:Canada
Commodities:Gold
Date:12/18/2019
Report Code:NI43-101
Report Type:Exploration/Drilling Update
Project Stage:Pursuing Resources Definition
Report details:18-12-2019: Skeena Resources Ltd. announces an Exploration/Drilling Update report for its Snip deposit at the Snip project. Drilling results incl. 1.50m @ 1131.91g/t Au from 249.60m. Vancouver, BC (December 18, 2019) Skeena Resources Limited (TSX.V: SKE,
Resources:x
CP/QP:[Overall Report]: Paul Geddes (Internal)
ABSTRACT:Vancouver, BC (December 18, 2019) Skeena Resources Limited (TSX.V: SKE, OTCQX: SKREF) (“Skeena” or the “Company”) is pleased to announce initial analytical results from the recently completed Phase I surface exploration drilling program at the 100% owned Snip gold project (“Snip”) located in the Golden Triangle of British Columbia. The 2019 surface program consisted of 10 surface drill holes totaling 1,934 m which expanded exploration of the 200 Footwall Corridor. Reference images are presented at the end of this release as well as on the Company’s website. The 2019 Phase I drilling was designed to validate an isolated, historical and incompletely sampled high-grade intersection in the 200 Footwall Corridor. The original target in the 200 Footwall was identified by 1997 underground drill hole UG-2610 which intersected 26.83 g/t Au over 3.40 m in an incompletely sampled zone. The recent intercept in drill hole S19-044 has discovered a new occurrence of very high-grade mineralization averaging 1,131.91 g/t Au over 1.50 m including a significant subinterval containing abundant visible gold grading 3,390.00 g/t Au over 0.50 m.

Full Report

opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.

Full Report