For thousands of other reports visit RSC's Mineral Intellingence Map

Ramelius Resources Ltd.

opaxe

Summary

Project:

Edna May

Deposit:Edna May
Location:Australia
Commodities:Gold
Date:12/10/2018
Report Code:JORC
Report Type:Exploration/Drilling Update
Project Stage:Pursuing Resource Increase/Upgrade
Report details:10-12-2018: Ramelius Resources Ltd. announces an Exploration/Drilling Update report for its Edna May deposit at the Edna May project. Drilling results incl. 9.0m @ 2.07g/t Au from 69m. Ramelius Resources Limited (ASX: RMS) is pleased to report the followi
Resources:(not mentioned in this report)
CP/QP:[Overall Report]: Kevin Seymour (Internal)
ABSTRACT:Ramelius Resources Limited (ASX: RMS) is pleased to report the following highly encouraging in-pit and regional exploration drilling results recently returned from its ongoing Exploration and Resource Development drilling programs at Mount Magnet and Edna May. Ramelius Managing Director, Mark Zeptner today said: “The discovery of the bonanza intersections immediately beneath the Stellar open pit, at Mount Magnet, is testament to the ongoing potential for this operation to deliver extremely high grade plunging ore shoots within and proximal to the known ore systems. This reinforces our commitment to continual exploration at Mount Magnet in driving reserve replacement to ultimately grow the gold camp well beyond its recorded 6 million ounces of production. Grade control drilling within the Stellar Open Pit had revealed the potential for a high-grade ore shoot extending beyond the current designed southern pit wall. Given the improving grades seen toward the base of the pit, two exploratory grade control RC holes were drilled from within the pit to test this plunge projection and intersected the following bonanza grade results. Eridanus Deeps diamond drilling was undertaken with three diamond holes (GXDD0074, 75 & 76) plus one diamond tail (GXRC0627) for an aggregate 2,282.2m (including 413m RC). A summary of the drilling completed is presented below. True widths remain undetermined at this stage as the litho-structural analysis of the various vein arrays observed in the diamond core is ongoing, but it is estimated that true widths will be 65-70% of the reported down hole intersections.

Full Report

opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.

Full Report