For thousands of other reports visit RSC's Mineral Intellingence Map

Peninsula Mines Ltd.

opaxe

Summary

Project:

Eunha

Deposit:Eunha
Location:South Korea
Commodities:Graphite
Date:8/15/2018
Report Code:JORC
Report Type:Resource Estimation
Project Stage:Pursuing Resources Definition
Report details:15-8-2018: Peninsula Mines Ltd. announces a Resource Estimation report for its Eunha deposit at the Eunha project. Exploration Target for Korean graphite projects. Peninsula Mines Ltd (ASX:PSM) has set a significant and high-grade, flake-graphite, Explora
Resources:Exploration Target: 750Kt - 1Mt @ 2-4% TGC at Eunha North
CP/QP:[Overall Report]: Daniel Noonan (Internal)
ABSTRACT:Peninsula Mines Ltd (ASX:PSM) has set a significant and high-grade, flake-graphite, Exploration Target estimate of 13 to 17 million tonnes grading 8% to 11% Total Graphitic Carbon (TGC) and containing 1.1 to 1.7 million tonnes of graphite for its 100% owned and granted Gapyeong, Yongwon and Eunha North, FlakeGraphite Projects in South Korea (see inset Figure 1 for location). The potential quantity (tonnage and contained graphite) and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration work conducted to estimate a Mineral Resource and it is uncertain if further exploration will result in the definition of a Mineral Resource at any of the Company’s graphite projects. The Exploration Target estimate issummarised in Table 1 below and has been determined using a combination of exploration data, that includes, mapping and surface channel samplingD1,D2,D14 , geophysical modelling of electromagnetics (EM) dataD9,D10,D15 and initial drilling at Eunha NorthD2 , that verified the correlation between channel sampling and EM modelling

Full Report

opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.

Full Report