For thousands of other reports visit RSC's Mineral Intellingence Map

Orezone Gold Corp.

opaxe

Summary

Project:

Bombore

Deposit:Siga East, Siga South
Location:Burkina Faso
Commodities:Gold
Date:9/12/2017
Report Code:NI43-101
Report Type:Exploration/Drilling Update
Project Stage:Pursuing Feasibility Study
Report details:12-9-2017: Orezone Gold Corp. announces an Exploration/Drilling Update report for its Siga East, Siga South deposit at the Bombore project. Drilling results incl. 15m @ 7.541g/t Au from 40m . September 12, 2017 - Orezone Gold Corporation (“Orezone” or the
Resources:(Not mentioned in this report)
CP/QP:[Overall Report]: Tim Miller, Pascal Marquis, Patrick Downey (Internal)
ABSTRACT:September 12, 2017 - Orezone Gold Corporation (“Orezone” or the “Company”) (TSXV:ORE) is pleased to report recent Reverse Circulation (“RC”) drilling results from the first two of four specifically identified target areas (See Press Release of June 22nd 2017) that have been prioritized within the Bomboré deposit to better define the extent and the geometry of discrete zones of high-grade gold mineralization within the oxidized portion of the known gold resources. The drilling at both Siga East and Siga South has been very successful in intercepting high grade mineralization which should improve grade domaining. More drilling will be required in certain areas to confirm the geometry of discrete higher grade zones. Patrick Downey President and CEO stated “We are extremely pleased with these drill results. We are now convinced that the specifically targeted areas can be discretely modelled within the main zone which should have a positive impact on the continued development of the project and we look forward to the ongoing drill results from the P11 and CFU zones.” The RC drilling programme commenced on July 8, 2017 and was designed as essentially infill holes to tighten up the drill spacing from 50 m by 25 m to 25 m by 25 m in the four specific target areas. To date 187 drill holes totalling approximately 9,400m have been completed at Siga East and Siga South. The drilling is ongoing with 4,500 m of RC drilling planned on the P11 and CFU target areas and these results are expected to be released early in Q4 2017.

Full Report

opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.

Full Report