For thousands of other reports visit RSC's Mineral Intellingence Map

Neo Lithium Corp.

opaxe

Summary

Project:

3Q

Deposit:3Q
Location:Argentina
Commodities:Lithium
Date:5/8/2019
Report Code:NI43-101
Report Type:Pre-Feasibility Study
Project Stage:Pursuing Resource Increase/Upgrade
Report details:8-5-2019: Neo Lithium Corp. announces a Pre-Feasibility Study report for its 3Q deposit at the 3Q project. Amended previous technical report to correct typos. The following report has been prepared by GHD Chile (“GHD”) and Groundwater Insight Inc. (“GWI”)
Resources:(Reserve, P+P): 1.3Mt of LCE with 790 mg/l Lithium
CP/QP:[Overall Report]: Waldo Perez, Gino Zandonai, Mark King (Internal;GHD Chile SA;Groudnwater Insight Inc.)
ABSTRACT:The following report has been prepared by GHD Chile (“GHD”) and Groundwater Insight Inc. (“GWI”) at the request of Neo Lithium Corporation (NLC), to provide NLC with an NI 43-101 compliant, Independent Technical Report and Preliminary Feasibility Study (PFS) on the Tres Quebradas (3Q) Project, in Catamarca Argentina. The mineral deposits that are the focus of this Report are related to lithium in brine contained within salar deposits and two brine lakes, at the 3Q Salar. The report provides a comprehensive assessment of geological, technical, engineering, operational and commercial aspects (economic analysis) under which the 3Q Project in northwest Argentina may be considered potentially economic so that the current development program can continue. GHD and GWI were commissioned for this service with the purpose of defining and quantifying the technical merits of the project and for determining the conditions under which the 3Q Project should be progressed to the Feasibility Study stage. Preparation of the Resource and Reserve Estimates, and supporting components, was supervised by Mark King, Ph.D., P. Geo., F.G.C., a “qualified person” (a “QP”) who is “independent” of NLC, as such terms are defined by NI 43-101. Dr. King supervised preparation of Sections 4 to 12, 14 to 16, 20 and 23, as well as associated information in Sections 1, 2, 3, 25 and 26. This report builds upon the Mineral Resource Estimate reports previously prepared for the 3Q Project (King, 2017 and King, 2018). Mr. Gino Zandonai, M.Sc., Mining Engineer., AusIMM, CP #0155, served as QP for the preparation of engineering information in this report. Mr. Zandonai is an independent Consultant for GHD and has no relationship with NLC as required by the definitions of NI 43-101. Mr. Zandonai has thoroughly reviewed the engineering information presented in this report

Full Report

opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.

Full Report