Use the filters in the side bar to make a selection
Select a commodity from the side bar filter
Resources | Frequency |
---|
Transaction Announcement Reports
This is a NEW feature of RSC Mineral Intelligence that displays global reports published since April 2017 relating to transactions of mineral exploration, resource development, and mining properties, including property acquisitions, company acquisitions and takeovers.
This feature not available currently and will be launched soon.
If you would like to increase your download limit, please submit your best contact phone number below, and we will give you a call to discuss your needs and provide a free limit increase.
To find out how you can increase your download limit, go to Manage Profile.
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ||
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ✓ | ✓ |
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Please confirm that you want to download this report. Your daily/weekly credit will be used when proceeded.
Your password or email is incorrect, please try again.
You have been successfully unsubscribed from our mailing list. We're sorry to see you go. Feel free to contact us if you have any questions.
Sorry! Try again.
Project: | Eloise | |
---|---|---|
Deposit: | Jericho | |
Location: | Australia | |
Commodities: | Copper-Gold | |
Date: | 11/7/2018 | |
Report Code: | JORC | |
Report Type: | Exploration/Drilling Update | |
Project Stage: | Pursuing Resources Definition | |
Report details: | 7-11-2018: Minotaur Exploration Ltd. announces an Exploration/Drilling Update report for its Jericho deposit at the Eloise project. Drilling results incl. 10.1m @ 1.09% Cu, 0.19g/t Au from 305.9m. Minotaur Exploration Ltd (ASX: MEP, ‘Minotaur’) advises th | |
Resources: | x | |
CP/QP: | [Overall Report]: Glen Little (Internal) | |
ABSTRACT: | Minotaur Exploration Ltd (ASX: MEP, ‘Minotaur’) advises that drilling into the ‘Jericho’ copper-gold system is underway again for the Eloise JV, 60km southeast of Cloncurry, NW Queensland. The diamond rig has been diverted from regional EM targets to place 2 additional holes in Jericho (Figure 1), before the imminent wet season terminates feld activity. LEVEL 1, 8 BEULAH ROAD, NORWOOD, SOUTH AUSTRALIA 5067 T +61 8 8132 3400 F +61 8 8132 3499 E [email protected] www.minotaurexploration.com.au Objective The new holes will bring the total to 30 for around 13,500m at Jericho. One hole will look to extend the J1 zone north beyond hole EL18D22 (Figure 2). The other hole will drill into a 1km gap in J2 zone (Figure 3) to investigate if mineralisation persists through that area. If successful, those two holes will extend J1 to more than 3500m in length and give confdence that J2 extends for at least 2000m (and possibly up to 2500m) as is currently modelled on existing drill hole data (Figure 4). 1 Assays from upper levels of hole reported to ASX on 25 October 2018, Shallow high-grade copper zones in ‘Jericho’ Drillhole data compilation Assays for the lower part of drill hole EL18D301 (details herein) illustrate continuity of copper-gold mineralisation within the J2 structure. Results include 10.1m @ 1.09% Cu & 0.19g/t Au from 305.9m and 6m @ 1.89% Cu, 0.49g/t Au from 326m (Table 1). Modelling of drill holes into J1 and J2 shows remarkable continuity of both EM conductors along strike (Figure 4). The close spatial relationship between J1 and J2 is apparent, where the steep dipping structures are near parallel and merely 125-200m apart. Given the exceptional continuity of both structures sizeable potential remains for additional mineralisation up dip – towards top of basement where drilling is limited - and down dip beyond current drill levels. Based on this compilation, the joint venture has redirected the rig from regional target work back to Jericho to complete two holes before the annual wet season imposes. | |
opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.
Full ReportPowered by:opaxe