Use the filters in the side bar to make a selection
Select a commodity from the side bar filter
Resources | Frequency |
---|
Transaction Announcement Reports
This is a NEW feature of RSC Mineral Intelligence that displays global reports published since April 2017 relating to transactions of mineral exploration, resource development, and mining properties, including property acquisitions, company acquisitions and takeovers.
This feature not available currently and will be launched soon.
If you would like to increase your download limit, please submit your best contact phone number below, and we will give you a call to discuss your needs and provide a free limit increase.
To find out how you can increase your download limit, go to Manage Profile.
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ||
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ✓ | ✓ |
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Please confirm that you want to download this report. Your daily/weekly credit will be used when proceeded.
Your password or email is incorrect, please try again.
You have been successfully unsubscribed from our mailing list. We're sorry to see you go. Feel free to contact us if you have any questions.
Sorry! Try again.
Project: | Razorback | |
---|---|---|
Deposit: | Razorback | |
Location: | Australia | |
Commodities: | Iron-Aluminium-Silica-Phosphorus | |
Date: | 11/12/2018 | |
Report Code: | JORC | |
Report Type: | Resource Estimation | |
Project Stage: | Pursuing Feasibility Study | |
Report details: | 12-11-2018: Magnetite Mines Ltd. announces a Resource Estimation report for its Razorback deposit at the Razorback project. Updated mineral resource estimate at the project. Magnetite Mines Limited (ASX: MGT)(the Company) is pleased to announce the update | |
Resources: | (Resource, I+I): 2732Mt @ 18.2% Fe, 48.1% SiO2, 8.0% Al2O3 | |
CP/QP: | [Resources]: Lynn Widenbar (Widenbar and Associates Pty Ltd.) | |
ABSTRACT: | Magnetite Mines Limited (ASX: MGT)(the Company) is pleased to announce the updated Mineral Resource Estimate of the Razorback Iron Project in accordance with the JORC 2012 Code and Guidelines. This JORC 2012 upgrade replaces the previous JORC 2004 estimates and represents an important progression towards the compliance with the mandatory system for the calculation of Mineral Resources. The Razorback Iron Project resource tonnage and resource categorisation remains unchanged and no material changes to the resource have been made as part of the JORC 2012 upgrade. The Razorback Iron Project which includes the Razorback Ridge and Iron Peak resources is the Company’s flagship project and primary focus as the Company determines the next steps required towards developing this world class asset. A summary of the new Mineral Resource as completed by independent consultant resource geologist Mr Lynn Widenbar of Widenbar and Associates Pty Ltd is shown below in Table 1, and a full report is appended to this release. The Razorback Ridge and Iron Peak Prospects occur within the Razorback Iron Project (Figure 1), located 244km NNE of Adelaide, South Australia. Drilling of the prospects began in 2010 and was completed in 2012 resulting in several iterations of Mineral Resource estimates over time. Optimisation of the resource occurring through 2013 via geochemical and metallurgical studies including Davis Tube Recovery (DTR) resulted in a JORC 2004 Mineral Resource estimate on which this JORC 2012 Mineral Resource estimate update is based. The drilled resource covers approximately 12km of strike length of the magnetite-rich (iron ore), Neoproterozoic-aged Braemar Iron Formation. The drilling completed represents approximately 36,000m of Reverse Circulation and Diamond Drilling during the 2010 to 2012 period. Based on the deposit economics, an 11% eDTR cut-off grade has been applied. The Razorback Iron Project Resource at various grade cut-offs is shown in Table 2 | |
opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.
Full ReportPowered by:opaxe