M3 Metals Corp.

opaxe

Summary

Project:

Block 103

Deposit:Block 103
Location:Canada
Commodities:Iron
Date:1/27/2020
Report Code:NI43-101
Report Type:Scoping Study
Project Stage:Pursuing Resource Increase/Upgrade
Report details:27-1-2020: M3 Metals Corp. announces a Scoping Study report for its Block 103 deposit at the Block 103 project. Scoping study reduces Cap-Ex costs by 85%. M3 Metals Corp. (TSX-V: MT; FSE: XOVP.F) (“M3 Metals” or the “Company”) is pleased to announce that
Resources:(Resource): 7.2Bt @ 29.2% Fe
CP/QP:[Overall Report]: Adrian Smith (Internal)
ABSTRACT:M3 Metals Corp. (TSX-V: MT; FSE: XOVP.F) (“M3 Metals” or the “Company”) is pleased to announce that it has completed a re-scoping study (the “Study”) on it’s 100 percent owned Block 103 Iron Ore Project (the “Project”) located in Newfoundland and Labrador, Canada. The Study was successful in reducing the projected capital costs on the Project from approximately 6 Billion dollars to 840 million dollars CAD. This was achieved by implementing a phased capacity approach beginning with the “base case” 4 million tonne per year projected production of high-grade premium iron ore fines concentrate from the previously proposed 16 million tonnes per year and by modifying processing methods and introducing new efficiencies. The Study also presents a projected operating cost per tonne (Op-Ex) for the base case 4 million tonne per year high grade (projected average 67.6 percent total iron based on 2013 PEA) concentrate at 51 dollars CAD per tonne Freight on Board (“FOB”) cost, excluding shipping costs. These numbers are calculated in Canadian dollars (“CAD”) and should be converted accordingly when considering pricing of the commonly referenced 62 percent benchmark and premium prices that are commonly reported in United States dollars (“USD”). Previously, the Company has spent over $38 million advancing the project to the PEA stage (Preliminary Economic Assessment). As a result, the Company defined a total of 7.2 billion tonnes at 29.2% total iron with metallurgical test results showing a projected 69.5% iron concentrate, and low 0.4:1 strip ratio. The historic 2013 43-101 Technical Report defining the Block 103 resource is available on Sedar and on the Company’s website.