For thousands of other reports visit RSC's Mineral Intellingence Map

Kin Mining NL

opaxe

Summary

Project:

Leonora

Deposit:Leonora
Location:Australia
Commodities:Gold
Date:12/15/2016
Report Code:JORC
Report Type:Pre-Feasibility Study
Project Stage:Pursuing Feasibility Study
Report details:15-12-2016: Kin Mining NL announces a Pre-Feasibility Study report for its Leonora deposit at the Leonora project. PFS results incl. pre-tax NPV (8%) of A$71%, IRR of 58%. Kin Mining NL (ASX: KIN) is pleased to advise that the Pre-Feasibility Study (PFS)
Resources:(Resource, I+I): 11.83Mt @ 1.9g/t Au for 721Koz Au contained at project
CP/QP:[Overall Report]: Don Harper (Internal)
ABSTRACT:Kin Mining NL (ASX: KIN) is pleased to advise that the Pre-Feasibility Study (PFS) on its 100%-owned Leonora Gold Project (LGP) in WA has delivered outstanding results, demonstrating that the project has the potential to generate strong cash-flows underpinned by low capital and operating costs, robust margins and a short payback period. Over recent months, with the support of independent consultants, Kin has updated costs and produced a new mining and processing strategy based upon the 2009 PFS completed by Navigator Resources (refer to ASX announcement 25 March 2009), to determine the most profitable path to gold production. A heap leach/ carbon-in-leach (CIL) combination and a 100% CIL processing option were evaluated. Following an optimisation process, it was determined the lowest risk pathway to developing the LGP was to adopt the processing route of a new conventional 750,000tpa CIL processing plant for the first two years, before ramping up in Year 3 to approximately 1.2 Mtpa through a modest mill expansion. The PFS concludes that the LGP is technically viable and economically robust, with a forecast production profile from open pit sources commencing at the rate of 43,000 oz Au per annum, and rising to 52,000 oz Au per annum by Year 3. Life-of-mine all-in sustaining costs (AISC) are forecast to be A$1,084/oz. Capital costs are estimated to be approximately A$35 million, with a capital payback period of approximately 18 months.

Full Report

opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.

Full Report