For thousands of other reports visit RSC's Mineral Intellingence Map

Kenmare Resources Plc

opaxe

Summary

Project:

Congolone

Deposit:Marrua
Location:Mozambique
Commodities:Ilmenite-Rutile-Zircon
Date:3/29/2018
Report Code:JORC
Report Type:Resource Estimation
Project Stage:Pursuing Feasibility Study
Report details:29-3-2018: Kenmare Resources Plc announces a Resource Estimation report for its Marrua deposit at the Congolone project. Annual report containing resource estimate update. The nature of Kenmare’s deposits, with abundant fresh water, no overburden, a good
Resources:(Resource, Inf.): 54Mt @ 4.1% THM at Marrua
CP/QP:[Resources]: Alastair Brown (Independent)
ABSTRACT:The nature of Kenmare’s deposits, with abundant fresh water, no overburden, a good ore grade and attractive products that do not have to be upgraded before being used, gives Kenmare the ability to mine, concentrate and separate its products with relatively low capital and operating costs. Kenmare operates a dedicated port facility adjacent to the MSP, which allows for the shipment of products to customers at minimum cost. Summary of reserves and resources The total proved and probable ore reserves under the Namalope, Pilivili, and Nataka mining concession are estimated as at 31 December 2017 at 1,742 million tonnes, grading 2.8% ilmenite, 0.19% zircon and 0.061% rutile, containing 48 million tonnes of ilmenite, 3.2 million tonnes of zircon and 1.06 million tonnes of rutile. The total ore resource (excluding reserves) held by the Group under a combination of exploration licences and mining concessions is estimated as at 31 December 2017 at 6.3 billion tonnes, grading 2.4% ilmenite, 0.16% zircon and 0.052% rutile, containing 149 million tonnes of ilmenite, 10 million tonnes of zircon and 3.3 million tonnes of rutile

Full Report

opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.

Full Report