Integra Gold Corp.

opaxe

Summary

Project:

Lamaque

Deposit:Triangle
Location:Canada
Commodities:Gold
Date:2/1/2017
Report Code:NI43-101
Report Type:Exploration/Drilling Update
Project Stage:Pursuing Resource Increase/Upgrade
Report details:1-2-2017: Integra Gold Corp. announces an Exploration/Drilling Update report for its Triangle deposit at the Lamaque project. Drilling results incl. 5.55m @ 36.86g/t Au from 160.35m. Integra Gold Corp. (TSX-V: ICG; OTCQX: ICGQF), ("Integra" or the "Compan
Resources:(not mentioned in this report)
CP/QP:[Overall Report]: Herve Thiboutot, Jaques Simoneau, Jessy Thelland (Internal;Integra)
ABSTRACT:Integra Gold Corp. (TSX-V: ICG; OTCQX: ICGQF), ("Integra" or the "Company") is pleased to announce additional assay results from its 2016 drill program on the Triangle Deposit (“Triangle”) situated on the Lamaque Gold Project (“Lamaque”) in Val-d’Or, Québec. The results announced today are from 16,800 m of drilling (42 drill holes) completed in 2016. Results are currently pending from an additional 9,750 m (28 drill holes) of diamond drilling at Triangle completed in 2016 and 2017. “A crosscut on the C2 Structure approximately 75 m west of the known limits of the resource further demonstrates the potential upside that exists at Triangle. This represents the first time a C Structure at Triangle was visible to Company geologists in an underground working face, giving the team the opportunity to visually inspect the structure and vein. The positive assay results from the channel sampling done on the structure and the vein geometries as they relate to the resource model, clearly - 2 - support what the Company has modeled through extensive drilling at Triangle,” noted Company President and CEO Stephen de Jong. The results announced today are from 42 drill holes (including partial holes, wedges and abandoned holes) representing 16,800 m of drilling. Drill results from 2016 and 2017 are pending from an additional 28 drill holes representing 9,750 m at Triangle. By the time of this news release all samples will have been received from the 2016 drill program at Triangle and will be included in the resource estimate update planned for Q1 2017. Results will continue to be disclosed as they become available. - 5 - In 2016, 123,230 m of drilling was completed at Lamaque, of which 104,820 m was completed on Triangle.