For thousands of other reports visit RSC's Mineral Intellingence Map

Hastings Technology Metals Ltd.

opaxe

Summary

Project:

Yangibana

Deposit:Bald Hill
Location:Australia
Commodities:Rare Earth
Date:6/28/2018
Report Code:NI43-101
Report Type:Exploration/Drilling Update
Project Stage:Mine Development
Report details:28-6-2018: Hastings Technology Metals Ltd. announces an Exploration/Drilling Update report for its Bald Hill deposit at the Yangibana project. Drilling results incl. 21m @ 1.64% TREO, 0.63% Nd2O3+Pr6O11 from 3.0m. Hastings Technology Metals Limited (ASX:H
Resources:(Reserve, Prob.): 5.16Mt @ 1.12% TREO at project
CP/QP:[Overall Report]: Andy Border (Internal)
ABSTRACT:Hastings Technology Metals Limited (ASX:HAS) is pleased to announce that its 2018 drilling programme at the Yangibana Rare Earths Project is well advanced and the first assay results have now been received. DRILLING RESULTS Assay results have been received from all holes at the Bald Hill deposit (Figure 1), with best intersections shown in Table 1 (stand outs highlighted). Details of hole coordinates and assays are shown in Appendices 1 and 2. The RC (reverse circulation) rig has now commenced an infill and extension drilling programme at Auer and Auer North deposits. The aim is to increase the resources at these deposits and to undertake sufficient geotechnical, environmental, metallurgical and mining studies such that additional reserves can be defined by the end of 2018.

Full Report

opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.

Full Report