Use the filters in the side bar to make a selection
Select a commodity from the side bar filter
Resources | Frequency |
---|
Transaction Announcement Reports
This is a NEW feature of RSC Mineral Intelligence that displays global reports published since April 2017 relating to transactions of mineral exploration, resource development, and mining properties, including property acquisitions, company acquisitions and takeovers.
This feature not available currently and will be launched soon.
If you would like to increase your download limit, please submit your best contact phone number below, and we will give you a call to discuss your needs and provide a free limit increase.
To find out how you can increase your download limit, go to Manage Profile.
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ||
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ✓ | ✓ |
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Please confirm that you want to download this report. Your daily/weekly credit will be used when proceeded.
Your password or email is incorrect, please try again.
You have been successfully unsubscribed from our mailing list. We're sorry to see you go. Feel free to contact us if you have any questions.
Sorry! Try again.
Project: | Malmbjerg | |
---|---|---|
Deposit: | Malmbjerg | |
Location: | Greenland | |
Commodities: | Molybdenum | |
Date: | 12/20/2018 | |
Report Code: | NI43-101 | |
Report Type: | Optimisation Study | |
Project Stage: | Pursuing Resource Increase/Upgrade | |
Report details: | 20-12-2018: Greenland Resources Inc. announces a Optimisation Study report for its Malmbjerg deposit at the Malmbjerg project. Concept study for Malmbjerg project. TORONTO, ONTARIO -- (December 20, 2018) – Greenland Resources Inc. (“Greenland Resources” o | |
Resources: | (not mentioned in this report) | |
CP/QP: | [Overall Report]: Jim Gray (Independent) | |
ABSTRACT: | TORONTO, ONTARIO -- (December 20, 2018) – Greenland Resources Inc. (“Greenland Resources” or the “Company”) is pleased to announce some of the results from a new Concept Study conducted by DRA Americas Inc. Canada (“DRA”) that was prepared using the independent pit constrained Mineral Resource estimate produced by RPA Inc. of Toronto, press released in November 23, 2018. The Company believes that the new results are very encouraging and will constitute the basis for discussions with selected potential partners. The updated Concept study was prepared by the following independent engineering firms and further optimizes engineering and costs from previous reports like our concept study press released on July 30, 2018 and the Wardrop 2008 Malmbjerg project feasibility study (“2008 FS”). The preferred Malmbjerg project development option continues to comprise an open pit, a hydraulic ore transportation tunnel and an innovated concept where all the ore processing infrastructure and support structures will be constructed offshore on barges and transported to the project site. The proposed mine development configuration includes: • A surface gyratory crusher and SAG mill grinding complex is located on the eastern segment of the open pit • A 450-micron grind product transported by gravity in an enclosed concrete pipeline, installed in a 5.5 km tunnel followed by a 20 km surface route to the concentrator located to the north at Mestersvig inlet • The tunnel with dimensions measuring 6m by 6m developed by conventional drilling and blasting operations provides access to the mine for all personnel, consumables, mobile equipment parts, and includes conduits for electr | |
opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.
Full ReportPowered by:opaxe