Use the filters in the side bar to make a selection
Select a commodity from the side bar filter
Resources | Frequency |
---|
Transaction Announcement Reports
This is a NEW feature of RSC Mineral Intelligence that displays global reports published since April 2017 relating to transactions of mineral exploration, resource development, and mining properties, including property acquisitions, company acquisitions and takeovers.
This feature not available currently and will be launched soon.
If you would like to increase your download limit, please submit your best contact phone number below, and we will give you a call to discuss your needs and provide a free limit increase.
To find out how you can increase your download limit, go to Manage Profile.
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ||
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ✓ | ✓ |
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Please confirm that you want to download this report. Your daily/weekly credit will be used when proceeded.
Your password or email is incorrect, please try again.
You have been successfully unsubscribed from our mailing list. We're sorry to see you go. Feel free to contact us if you have any questions.
Sorry! Try again.
Project: | Glenburgh | |
---|---|---|
Deposit: | New Cobra | |
Location: | Australia | |
Commodities: | Gold | |
Date: | 9/17/2018 | |
Report Code: | JORC | |
Report Type: | Exploration/Drilling Update | |
Project Stage: | Pursuing Resource Increase/Upgrade | |
Report details: | 17-9-2018: Gascoyne Resources Ltd. announces an Exploration/Drilling Update report for its New Cobra deposit at the Glenburgh project. Drilling results incl. 7m @ 7.8g/t Au from 84m. Gascoyne Resources Limited (“Gascoyne” or “Company”)(ASX:GCY) is pleased | |
Resources: | (Resource, Total): 21.3Mt @ 1.5g/t Au for 1.003Moz contained at Project | |
CP/QP: | [Overall Report]: Julian Goldsworthy (Internal) | |
ABSTRACT: | Gascoyne Resources Limited (“Gascoyne” or “Company”)(ASX:GCY) is pleased to provide an operational update on the Dalgaranga Gold Project as well as reporting significant new assay results returned to date from exploration drilling at both the Dalgaranga and Glenburgh Gold Projects completed in the previous quarter. Dalgaranga Gold Mine Operational Update: During the September quarter, ramp up of gold production has continued, with over 10,050 ounces of gold recovered to date. Mining has continued to ramp up, with daily movement of approximately 55,000 bulk cubic metres (BCM). This is broadly inline with the mining schedule. As advised in the June Quarterly report, due to the early commissioning of the processing plant and a slower mining ramp up than planned, oxide ore feed has been supplemented by processing lower grade laterite stockpiles. This was required as the ore release from the pits was insufficient to maintain mill feed while removal of overburden and zones of variable near surface grade was completed. Ore release from the three pits is now sufficient to allow continuous mill feed with oxide ore. The change from processing a high proportion of the lower grade laterite ore to processing 100% oxide ore has seen the mill thoughput rate increase during September from 240 tonnes per hour to in excess of 320 tonnes per hour. Plans are in place to increase this to +350 tonnes per hour. Mill feed grades have averaged 0.8 g/t for the quarter to date, with metallurgical recoveries averaging 92%. A major backlog of assay results from the 2018 RC drill programme that was completed approximately 2 months ago is gradually being cleared. Results are now being received regularly. Significant new results are reported below | |
opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.
Full ReportPowered by:opaxe