Use the filters in the side bar to make a selection
Select a commodity from the side bar filter
Resources | Frequency |
---|
Transaction Announcement Reports
This is a NEW feature of RSC Mineral Intelligence that displays global reports published since April 2017 relating to transactions of mineral exploration, resource development, and mining properties, including property acquisitions, company acquisitions and takeovers.
This feature not available currently and will be launched soon.
If you would like to increase your download limit, please submit your best contact phone number below, and we will give you a call to discuss your needs and provide a free limit increase.
To find out how you can increase your download limit, go to Manage Profile.
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ||
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ✓ | ✓ |
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Please confirm that you want to download this report. Your daily/weekly credit will be used when proceeded.
Your password or email is incorrect, please try again.
You have been successfully unsubscribed from our mailing list. We're sorry to see you go. Feel free to contact us if you have any questions.
Sorry! Try again.
Project: | Mount Coolon | |
---|---|---|
Deposit: | Koala Gold Mine | |
Location: | Australia | |
Commodities: | Gold | |
Date: | 10/21/2016 | |
Report Code: | JORC | |
Report Type: | Exploration/Drilling Update | |
Project Stage: | Pursuing Resource Increase/Upgrade | |
Report details: | 21-10-2016: GBM Resources Ltd. announces an Exploration/Drilling Update report for its Koala Gold Mine deposit at the Mount Coolon project. Drilling results incl. 3.5m @ 14.7g/t Au from 44m. Australian Resources company GBM Resources Limited (ASX: GBZ) (“ | |
Resources: | (Resource, Measured): 0.114Mt @ 1.7g/t Au for 6200oz Au contained at project | |
CP/QP: | [Overall Report]: Neil Norris (Internal) | |
ABSTRACT: | Australian Resources company GBM Resources Limited (ASX: GBZ) (“GBM” or “the Company”) wishes to advise that it is nearing completion of the first stage of its diamond drilling program testing the central mineralised zone at the Koala Gold Mine at Mount Coolon, located in the Drummond Basin, Queensland. The drilling has confirmed the presence of remnant high-grade quartz vein and breccia style mineralisation in a number of locations within a broader halo of intense silica pyrite mineralisation. Results have now been received for 8 of the 19 holes with the remaining assay results expected to be received progressively from now until the end of November 2016. To date a total of 19 holes and 1,023 metres of drilling has been completed. The drilling campaign commenced in August on a single rig single shift (for operational safety reasons) basis. Between 4 and 7 holes remain to be drilled depending upon the success of holes in penetrating old mine workings. To date 70% of holes have either successfully passed through old stopes or have not encountered voids from previous mining. The program is designed to infill historical data through the Koala Lode within the area of old underground workings located along strike of the Ross Mining open pit. Drilling has been designed to test for mineralisation along stope margins and high-grade lode quartz in remnants and along strike from stopes on approximately 50 metre sections. Maximum drill hole target depths have been kept to practical below-surface depths for open pit mining as indicated by preliminary pit optimisations. The Company expects to be in a position to confirm the intention to proceed with the development of either toll milling or heap leaching the old open pits, along with the progress of the Eugenia Heap Leach or both by the end of the fourth quarter this calendar year. | |
opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.
Full ReportPowered by:opaxe