Use the filters in the side bar to make a selection
Select a commodity from the side bar filter
Resources | Frequency |
---|
Transaction Announcement Reports
This is a NEW feature of RSC Mineral Intelligence that displays global reports published since April 2017 relating to transactions of mineral exploration, resource development, and mining properties, including property acquisitions, company acquisitions and takeovers.
This feature not available currently and will be launched soon.
If you would like to increase your download limit, please submit your best contact phone number below, and we will give you a call to discuss your needs and provide a free limit increase.
To find out how you can increase your download limit, go to Manage Profile.
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ||
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ✓ | ✓ |
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Please confirm that you want to download this report. Your daily/weekly credit will be used when proceeded.
Your password or email is incorrect, please try again.
You have been successfully unsubscribed from our mailing list. We're sorry to see you go. Feel free to contact us if you have any questions.
Sorry! Try again.
Project: | Pan Mine | |
---|---|---|
Deposit: | Pan Mine | |
Location: | United States | |
Commodities: | Gold | |
Date: | 5/17/2018 | |
Report Code: | NI43-101 | |
Report Type: | Exploration/Drilling Update | |
Project Stage: | Active Mining & Production | |
Report details: | 17-5-2018: Fiore Gold Ltd. announces an Exploration/Drilling Update report for its Pan Mine deposit at the Pan Mine project. Drilling results incl. 45.7m @ 0.72g/t Au from 48.8m. Vancouver, British Columbia – FIORE GOLD LTD. (TSXV: F) (OTCQB: FIOGF) (“Fio | |
Resources: | (Reserve, P+P): 318,000oz Au contained at Pan Mine | |
CP/QP: | [Overall Report]: Eric LeLacheur (Internal) | |
ABSTRACT: | Vancouver, British Columbia – FIORE GOLD LTD. (TSXV: F) (OTCQB: FIOGF) (“Fiore” or the “Company”) is is pleased to provide results from an additional seven holes of its 2018 drill program at its Pan Mine in Nevada, part of a long-term program aimed at expanding the resource and reserve base at Pan. The current drilling is aimed at expanding reserves and resources near the North Pit which hosts most of the silica-rich rocky ore at Pan. Drilling is also planned for the Central area of the deposit to expand existing resources there as well as test new targets. Mining at Pan is currently taking place in both the rocky North Pan Zone and the clayey South Pan Zone, with the run-of-mine ores blended on the leach pad. The seven holes reported here were drilled near the northern end of the North Pit, at Red Hill and in the West Contact area on the western side of the North Pit (Figure 1). The holes were intended to test the potential to expand the existing oxide reserves both at depth and laterally beyond the current reserve boundaries. The 2017 Pan Mine Feasibility Study defines Proven and Probable reserves of 318,000 gold ounces at an average grade of 0.51 g/t gold (0.015 oz/ton), with reserve cutoff grades of 0.21 g/t gold for the North and Central pits, and 0.14 g/t gold for the South Pit. Tim Warman, Fiore’s CEO commented, “The new intercepts at Red Hill are particularly interesting, since Red Hill hosts the highest-grade portion of the Pan deposit, and all of these new Red Hill intercepts are outside of the currently planned pit envelope. Our mine planning team is currently evaluating whether this new mineralization will allow us to deepen the planned Red Hill pit to bring in additional resources.” As previously announced, Fiore has approved an additional 5,030 metres (16,500 ft) of RC drilling, and 1,495 metres (4,900 ft) of diamond drilling at Pan in FY2018, as well as 4,265 metres (14,000 ft) of RC drilling at the nearby Gold Rock project. Drilling is ongoing at Pan, while drilling at Gold Rock is scheduled to start in July. | |
opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.
Full ReportPowered by:opaxe