Use the filters in the side bar to make a selection
Select a commodity from the side bar filter
Resources | Frequency |
---|
Transaction Announcement Reports
This is a NEW feature of RSC Mineral Intelligence that displays global reports published since April 2017 relating to transactions of mineral exploration, resource development, and mining properties, including property acquisitions, company acquisitions and takeovers.
This feature not available currently and will be launched soon.
If you would like to increase your download limit, please submit your best contact phone number below, and we will give you a call to discuss your needs and provide a free limit increase.
To find out how you can increase your download limit, go to Manage Profile.
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ||
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ✓ | ✓ |
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Please confirm that you want to download this report. Your daily/weekly credit will be used when proceeded.
Your password or email is incorrect, please try again.
You have been successfully unsubscribed from our mailing list. We're sorry to see you go. Feel free to contact us if you have any questions.
Sorry! Try again.
Project: | Terronera | |
---|---|---|
Deposit: | Terronera | |
Location: | Mexico | |
Commodities: | Silver-Gold | |
Date: | 9/19/2018 | |
Report Code: | NI43-101 | |
Report Type: | Exploration/Drilling Update | |
Project Stage: | Mine Development | |
Report details: | 19-9-2018: Endeavour Silver Corp. announces an Exploration/Drilling Update report for its Terronera deposit at the Terronera project. Drilling results incl. 6.1m @ 0.9g/t Au, 1297g/t Ag from 351.40m. VANCOUVER, British Columbia, Sept. 19, 2018 -- Endeavou | |
Resources: | (not mentioned in this report) | |
CP/QP: | [Overall Report]: Godfrey Walton (Internal) | |
ABSTRACT: | VANCOUVER, British Columbia, Sept. 19, 2018 -- Endeavour Silver Corp. (NYSE: EXK, TSX: EDR) reports that infill drilling within the Terronera vein system on the Terronera property in Jalisco State, Mexico (view Terronera map here) has intersected high grade silver-gold mineralization in an additional 17 drill holes. Drilling highlights include three high grade vein splays, totaling 12.3 metres (m) accumulated thickness, intersected in hole TR11-8, the best of which returned 1,297 grams per tonne (gpt) silver and 0.9 gpt gold over a 6.1 m true width (39.9 oz per short ton (opT) silver equivalent (AgEq) over 20.0 feet (ft) (see Terronera long section here). All 17 drill holes were targeted to fill gaps in the drill pattern, with the goal to upgrade one million tonnes of inferred resources to measured and indicated resources so they can be included in the mine plan for Terronera, and to expand the inferred resources at depth. Mineralization in the Terronera vein has been intersected over 1400 m long by 500 m deep, and it remains open at depth. Luis Castro, Vice President, Exploration for Endeavour Silver, commented, “These infill drill results helped us meet our goal this year to increase our measured and indicated resources. The high silver and gold grades, excellent continuity of mineralization and significant exploration upside to expand the resources reinforce our view that Terronera has the potential to become the next key asset for the Company.” The 2018 infill drill program is now complete with 32 holes totaling 18,774 m, more than the 10,000 m originally planned but less than the revised plan of 20,000 m, as the program goals were attained. A revised resource and reserve estimate will now be prepared for release in Q1, 2019 and the mine plan will be modified to accommodate the newly defined resources. These 2018 drill results for Terronera, were not included in the 2018 updated Terronera Preliminary Feasibility Study, additionally see Endeavour Silver News Release dated June 27, 2018. | |
opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.
Full ReportPowered by:opaxe