Use the filters in the side bar to make a selection
Select a commodity from the side bar filter
Resources | Frequency |
---|
Transaction Announcement Reports
This is a NEW feature of RSC Mineral Intelligence that displays global reports published since April 2017 relating to transactions of mineral exploration, resource development, and mining properties, including property acquisitions, company acquisitions and takeovers.
This feature not available currently and will be launched soon.
If you would like to increase your download limit, please submit your best contact phone number below, and we will give you a call to discuss your needs and provide a free limit increase.
To find out how you can increase your download limit, go to Manage Profile.
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ||
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ✓ | ✓ |
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Please confirm that you want to download this report. Your daily/weekly credit will be used when proceeded.
Your password or email is incorrect, please try again.
You have been successfully unsubscribed from our mailing list. We're sorry to see you go. Feel free to contact us if you have any questions.
Sorry! Try again.
Project: | Curraghinalt | |
---|---|---|
Deposit: | Curraghinalt | |
Location: | Northern Ireland | |
Commodities: | Gold-Silver | |
Date: | 9/11/2017 | |
Report Code: | NI43-101 | |
Report Type: | Resource Estimation | |
Project Stage: | Pursuing Resource Increase/Upgrade | |
Report details: | 11-9-2017: Dalradian Resources Inc. announces a Resource Estimation report for its Curraghinalt deposit at the Curraghinalt project. Revised mineral resources and reserves sees an increase in contained ounces. TORONTO, September 11, 2017/Marketwired/ - Da | |
Resources: | (Reserve, P+P): 1.604Mt @ 10.04g/t Au for 517.8koz Au contained at project | |
CP/QP: | [Resources]: Eric Tremblay, Greg Hope (Internal) | |
ABSTRACT: | TORONTO, September 11, 2017/Marketwired/ - Dalradian Resources Inc. (TSX:DNA; AIM:DALR) ("Dalradian" or the "Company") announces that a sensitivity study estimation performed on two of the major veins in the Curraghinalt gold deposit (T17 and V75 veins) resulted in a 37% increase in grade and a 10% increase in ounces. In the new study, the geology wireframes were re-modelled using assays with a heavier emphasis on logged geology. This approach yields 24% narrower veins accompanied by a.20% decrease in tonnage. (See Tables 1 and 2 below.) Composite length was adjusted from 0.5 to 0.3 metres to reflect the narrower domains, but all other parameters remain unchanged with the aim to isolate the impact of re-wireframing. Dalradian assessed the impact of the revised modelling methodology on potentially mineable material for the two veins by applying the same parameters as those used in the December 2016 feasibility study (FS). It was found that the revised vein block models resulted in a higher potentially mineable tonnage of 34% and a corresponding increase in mineable ounces of 32% at the expense of a marginal decrease in grade (1.5%). (See Tables 3 and 4 below.) This change in modelling sequence, where wireframing is carried out on geology and assays, followed by compositing within these wireframes, can in part explain the positive reconciliation between mill and resource (42% more ounces) resulting from the test stopes completed in 2016. (See news releases of September 14 and December 8.) Patrick F.N. Anderson, President and CEO said, "We are pleased with the results of this exercise, which uses the same drill data to compare the impact of wireframing prior to compositing, in estimating the mineral resources and resulting mineral reserves at Curraghinalt. The new method is the culmination of a great amount of hard work and reflects our better understanding of the deposit. The resulting shapes for the T17 and V75 veins are more heavily influenced by geology as opposed to previous models which were largely grade driven. This has resulted in smoother, higher grade veins that are only slightly narrower than in the previous model. The implications are that we can use longhole mining methods more extensively and bring new ounces into the mine plan which had previously been below the cut-off grade (see Figure 1). The bottom line is that we have 32% more mineable ounces for the two veins tested." | |
opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.
Full ReportPowered by:opaxe