Use the filters in the side bar to make a selection
Select a commodity from the side bar filter
Resources | Frequency |
---|
Transaction Announcement Reports
This is a NEW feature of RSC Mineral Intelligence that displays global reports published since April 2017 relating to transactions of mineral exploration, resource development, and mining properties, including property acquisitions, company acquisitions and takeovers.
This feature not available currently and will be launched soon.
If you would like to increase your download limit, please submit your best contact phone number below, and we will give you a call to discuss your needs and provide a free limit increase.
To find out how you can increase your download limit, go to Manage Profile.
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ||
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ✓ | ✓ |
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Please confirm that you want to download this report. Your daily/weekly credit will be used when proceeded.
Your password or email is incorrect, please try again.
You have been successfully unsubscribed from our mailing list. We're sorry to see you go. Feel free to contact us if you have any questions.
Sorry! Try again.
Project: | Pilar | |
---|---|---|
Deposit: | Pilar | |
Location: | Mexico | |
Commodities: | Gold-Silver | |
Date: | 5/31/2018 | |
Report Code: | NI43-101 | |
Report Type: | Exploration/Drilling Update | |
Project Stage: | Pursuing Resources Definition | |
Report details: | 31-5-2018: Colibri Resource Corp. announces an Exploration/Drilling Update report for its Pilar deposit at the Pilar project. Drilling results incl. 40.50m @ 0.73g/t Au from 33.00m. DIEPPE, NB, May 31, 2018 /CNW/ - (CBI: TSX-V) – Colibri Resource Corporat | |
Resources: | x | |
CP/QP: | [Overall Report]: Jackie Stevens (Internal) | |
ABSTRACT: | DIEPPE, NB, May 31, 2018 /CNW/ - (CBI: TSX-V) – Colibri Resource Corporation ("Colibri" or the "Company") wishes to announce assay results from 16 more holes completed on its Phase 1 reverse circulation (RC) drilling program on its 100% owned Pilar Gold Project in Sonora, Mexico. Results include an intersection of 5.37 grams per tonne (g/t) Au over an intersection length of 3.0 meters (m) in hole JES18-19 which was part of a longer intersection of 40.5m of 0.73 g/t. All holes drilled in the 2018 campaign to date at Pilar have intersected gold mineralization ranging from anomalous to high grade. Hole JES-18-3, previously released (see Colibri NR dated May 8, 2018) intersected 8.16 g/t Au over an intersection length of 9 m. Significant intersection results for the last 16 holes drilled at Pilar are presented in table 1 below and indicated on the hole locations are presented on the attached map. In addition to the relatively long intersection in hole JES-18-19, similar intersections in hole JES-18-6 (0.31 g/t Au over an intersection length of 22.5 m including 0.73 g/t Au over 6 m) and hole JES-18-14 (0.20 g/t Au over an intersection length of 52.5 m including 0.51 g/t Au over an intersection length of 12m) confirm the previously interpreted 0.20 g/t Au mineral envelope comprising the Main Zone. The objectives of the Phase 1 drill program at Pilar are to test for continuity within previously interpreted zones of mineralization, test for extensions to the known mineralization, and explore locally for new zones of gold mineralization. In addition, the Company has recently completed a soil geochemistry survey of the eastern half of the Pilar property. To date, 2,117 metres (20 holes) of the planned 3,000 m Phase 1 RC drill program have been completed. The Company is reviewing the recent drilling and exploration results and is now drilling the final 900 m of the Phase 1 drill program. | |
opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.
Full ReportPowered by:opaxe