Use the filters in the side bar to make a selection
Select a commodity from the side bar filter
Resources | Frequency |
---|
Transaction Announcement Reports
This is a NEW feature of RSC Mineral Intelligence that displays global reports published since April 2017 relating to transactions of mineral exploration, resource development, and mining properties, including property acquisitions, company acquisitions and takeovers.
This feature not available currently and will be launched soon.
If you would like to increase your download limit, please submit your best contact phone number below, and we will give you a call to discuss your needs and provide a free limit increase.
To find out how you can increase your download limit, go to Manage Profile.
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ||
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ✓ | ✓ |
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Please confirm that you want to download this report. Your daily/weekly credit will be used when proceeded.
Your password or email is incorrect, please try again.
You have been successfully unsubscribed from our mailing list. We're sorry to see you go. Feel free to contact us if you have any questions.
Sorry! Try again.
Project: | Thackaringa | |
---|---|---|
Deposit: | Thackaringa | |
Location: | Australia | |
Commodities: | Cobalt-Sulphur-Iron | |
Date: | 7/4/2018 | |
Report Code: | JORC | |
Report Type: | Pre-Feasibility Study | |
Project Stage: | Pursuing Pre-Feasibility Study | |
Report details: | 4-7-2018: Cobalt Blue Holdings Ltd. announces a Pre-Feasibility Study report for its Thackaringa deposit at the Thackaringa project. PFS results incl. post-tax NPV of A $544M (7.5%), IRR of 22%, Initial ore reserve at Thackaringa. The PFS clearly demonstr | |
Resources: | (Reserve, Prob.): 46.3Mt @ 819ppm Co, 8.83% S | |
CP/QP: | [Overall Report]: Peter Buckley (Left Field Geoscience Services) | |
ABSTRACT: | The PFS clearly demonstrated the Ore Reserve case for Thackaringa was NPV positive and that the project was economic. A Production Target (Potential Upside Mining Case) was modelled using sensitivity analysis. The Production Target of 58.7M tonnes @ 802ppm cobalt included the Probable Ore Reserve and a partial component of the Inferred Resource. Production Target outcomes are set out in Table 2. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised. Cobalt Blue is pleased to report a maiden Ore Reserve Statement and Preliminary Feasibility Study for the Thackaringa Cobalt Project. Mining One has issued a JORC 2012 compliant Ore Reserve Statement to Cobalt Blue, and this is detailed in the following sections in accordance with ASX Listing Rule 5.9.1. Cobalt Blue has completed the Preliminary Feasibility Study, and has subsequently served notice to Broken Hill Prospecting Limited (‘BPL’), that Cobalt Blue has fulfilled the requirements of Stage 2 of the Thackaringa Joint Venture. The outcomes of the PFS are detailed in the following sections. The PFS has detailed a technically feasible and economic project for production of cobalt sulphate heptahydrate and elemental sulphur from the Thackaringa deposits. The project assumed a 5.25Mtpa ore throughput rate. Using the mining ore reserve, a project life of 9.3 years (10 years of operations inclusive of ramp up period) was delineated.The Production Target mine life is extended to 12.8 years (13 years of operations inclusive of ramp up period). | |
opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.
Full ReportPowered by:opaxe