Report details:25-10-2018: B2Gold Corp. announces a Resource Estimation report for its Fekola deposit at the Fekola project. Updated mineral resource estimate at the project. Vancouver, October 25, 2018 – B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) ("B2Gold" o
Resources:(Resource): 92.810Mt @ 1.92g/t Au (Ind.), 26.50Mt @ 1.61g/t Au (Inf.)
CP/QP:[Resources]: John Rajala (Internal)
ABSTRACT:Vancouver, October 25, 2018 – B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) ("B2Gold" or the "Company") announces a substantial increase in the Mineral Resource estimate for the Fekola Mine and positive results from the ongoing Fekola mill expansion study. The new increased Mineral Resource and the positive results, to date, from the Fekola mill expansion study indicate the potential to increase mill throughput tonnage and increase annual gold production from Fekola with moderate capital expenditure. Based on approximately 192,000 metres of exploration drilling in 928 drill holes (including 70,877 metres in 294 holes drilled by B2Gold since June 2014), B2Gold is pleased to report an updated Indicated Mineral Resource estimate of 92,810,000 tonnes at 1.92 grams per tonne ("g/t") gold, for a total of 5,730,000 ounces of gold, and an Inferred Mineral Resource estimate of 26,500,000 tonnes at 1.61 g/t gold, for a total of 1,370,000 ounces of gold, for the Fekola Mine located in southwestern Mali. Mineral Resources are reported within a pit shell using a $1,400/ounce gold price and above a cutoff of 0.6 g/t gold. Probable Reserves at the start of production at Fekola were 49.2 million tonnes at 2.35 g/t gold containing 3.7 million ounces. These initial reserves (less material mined to December 31, 2017) are contained within the updated resource (see table and longitudinal section below). In addition, pit shells were run using a gold price of $1,250/ounce and demonstrate Fekola’s resiliency to lower gold prices. The Indicated Mineral Resource contains 90,670,000 tonnes at 1.94 g/t gold for a total of 5,667,000 ounces of gold, and Inferred Mineral Resources of 16,620,000 tonnes at 1.58 g/t gold containing 844,000 ounces of gold (see table and longitudinal section below). The new Mineral Resource is contiguous to the north of the current Fekola reserve pit boundary and extends the resource pit boundary 1.2 km to the north (see attached longitudinal section). Exploration drill results further north of the new resource pit boundary demonstrate that gold mineralization continues to the north, and remains open, indicating the potential to further expand Mineral Resources with additional drilling.