For thousands of other reports visit RSC's Mineral Intellingence Map

Avenira Ltd.

opaxe

Summary

Project:

Baobab

Deposit:Baobab
Location:Republic Of Senegal
Commodities:Phosphate
Date:3/18/2019
Report Code:JORC
Report Type:Feasibility Study
Project Stage:Pursuing Environmental Approval
Report details:18-3-2019: Avenira Ltd. announces a Feasibility Study report for its Baobab deposit at the Baobab project. Feasibility Study results incl. post-tax NPV of US $212M, IRR of 25.5%, Initial ore reserve. Avenira Limited ('Avenira' or the 'Company') (ASX: AEV)
Resources:(Reserve, Prob.): 39.305Mt @ 18.9% P2O5 for 7446Kt P2O5
CP/QP:[Overall Report]: Jeffrey Stevens, Gerrit Vos (Wood Plc)
ABSTRACT:Avenira Limited ('Avenira' or the 'Company') (ASX: AEV) is pleased to announce the completion of the Feasibility Study (‘FS’, ‘Feasibility Study’ or the ‘Study’) (Class 4 estimate) for the expansion of its 80%-owned Baobab Phosphate Project (‘Project’) in the Republic of Senegal to a projected high-grade phosphate rock mine with a concentrate product capacity of 1 Mtpa. The FS confirms the technical and financial robustness of a long-life operation for the Company’s Baobab Phosphate Project. This Feasibility Study is classified as an AACE Class 4 estimate with a ± 20% estimated accuracy. The “Bankable” or “Definitive” Feasibility Study (‘BFS’) phase intended to follow will target an AACE Class 3 estimate with a ±10% accuracy The FS is based on an open-pit strip-mining design and conventional flotation and magnetic separation ore processing plant operating at an ore throughput of 2.9Mtpa and a phosphate rock concentrate post ramp-up production rate of 1Mtpa. It determined that the Project’s Probable Ore Reserve is 39.3Mt at 18.9% P2O5. The Study indicates a technically sound and financially robust project, delivering post-tax unlevered NPV of US$212M and IRR of 25.5% over a 13.4-year mine life based on the Project’s Indicated Resource. Finalisation of the FS represents a key milestone in the evolution of the Project. The Company intends to initiate the BFS phase (Class 3 estimate) once the final project configuration has been confirmed as part of a planned value-engineering study. Concurrently, the Company intends to undertake more advanced and detailed discussions with potential funding parties. BFS completion is projected to take place during the December 2019 Quarter.

Full Report

opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.