Use the filters in the side bar to make a selection
Select a commodity from the side bar filter
Resources | Frequency |
---|
Transaction Announcement Reports
This is a NEW feature of RSC Mineral Intelligence that displays global reports published since April 2017 relating to transactions of mineral exploration, resource development, and mining properties, including property acquisitions, company acquisitions and takeovers.
This feature not available currently and will be launched soon.
If you would like to increase your download limit, please submit your best contact phone number below, and we will give you a call to discuss your needs and provide a free limit increase.
To find out how you can increase your download limit, go to Manage Profile.
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ||
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Features offered: | |||
---|---|---|---|
RSC News | ✓ | ✓ | ✓ |
Intel Weekly Bulletin | ✓ | ✓ | ✓ |
List of Reports published by week | ✓ | ✓ | ✓ |
Technical Report Highlights | Gold only | ✓ | ✓ |
Technical Report PDF Downloads | Gold only | ✓ | ✓ |
Transaction Report Highlights | ✓ | ✓ | |
Transaction Report PDF Downloads | 3 downloads per day, 10 per week | ✓ | |
Saved preferences | ✓ | ✓ | |
User Generated Custom Reports | ✓ | ||
Alerts (Mobile App) | ✓ |
Please confirm that you want to download this report. Your daily/weekly credit will be used when proceeded.
Your password or email is incorrect, please try again.
You have been successfully unsubscribed from our mailing list. We're sorry to see you go. Feel free to contact us if you have any questions.
Sorry! Try again.
Project: | KNP | |
---|---|---|
Deposit: | KNP | |
Location: | Australia | |
Commodities: | Cobalt-Nickel-Scandium-Chromium | |
Date: | 6/28/2017 | |
Report Code: | JORC | |
Report Type: | Resource Estimation | |
Project Stage: | Pursuing Pre-Feasibility Study | |
Report details: | 28-6-2017: Ardea Resources Ltd. announces a Resource Estimation report for its KNP deposit at the KNP project. Remodelling of historic data leads to an increase in KNP Cobalt Zone resource. Ardea Resources Limited (ASX: ARL, “Ardea” or “the Company”) is p | |
Resources: | (Resource, Total): 65.7Mt @ 0.13% Co, 0.79% Ni at KNP Cobalt Zone | |
CP/QP: | [Resources]: Stephen Hyland (HGMC Cunsultants) | |
ABSTRACT: | Ardea Resources Limited (ASX: ARL, “Ardea” or “the Company”) is pleased to announce that remodelling of the Goongarrie South and Big Four areas of the KNP Cobalt Zone to focus on cobalt mineralisation has been completed. The remodelling, which uses historical drill data but applies cobalt cut-offs (as opposed to nickel cut-offs used for all previous modelling work), has resulted in substantial increases in the tonnage and grade of the cobalt resource. These new resources estimates are defined based on a complete remodelling of historic data. This was done by stripping back to original drill holes and assays and constructing new triangulations and cobalt grade shells. These new cobalt grade shells more accurately represent the distributions of cobalt mineralisation. Earlier cobalt estimates relied on cobalt distributions within nickel grade shells. In comparison to the new cobalt grade shells, the nickel grade shells were thicker and more irregular in shape, and incorporated broad zones of little cobalt mineralisation along with the higher-grade zones. Additionally, the new cobalt grade shells are more extensive and incorporate additional cobalt intercepts that weren’t part of earlier estimates. Several new high-grade zones have thus been identified. Further upgrades to the KNP Cobalt Zone resource are expected as remodelling of the constituent deposits beyond Goongarrie South and Big Four using cobalt-only cut-offs continues. This new resource represents mineralisation that is potentially mineable by open pit. A pit optimisation model, which uses various high-level parameters such as current and forecast economic data, proposed production rates, and forecast production costs, portrays several realistic economic models to define conceptual pit designs. The pit optimisation model used here is very much a preliminary one that will be fully optimised during the course of the PFS and will be published on completion of the study. | |
opaxe is a smart software platform that reconfigures and redistributes information and produces business insights to help mining professionals and investors make better decisions. We utilise technology and machine learning for data collection and human intelligence for the value-added services.
Full ReportPowered by:opaxe